Architects and engineers face daunting challenges with structures, designs and workflows becoming more complex. While 2D designs might look great and are employed as standard by J MARSTON ENGINEERS, nothing compares to giving clients a fully animated visual of their product or equipment. Optional 3D modelling shows a client a polished, interactive and accurate visual representation of the final product, which can be critical when a new laboratory has been designed with BIMs (Building Information Modelling. A process involving the generation and management of digital representations of physical and functional characteristics of places).
Having designed and manufactured your new equipment our Site Operatives are fully capable of undertaking its installation which can also include (subject to survey) the associated PVC fume extraction system.